Environmental permit application handed in
On December the 22nd 2011, an environmental permit application for Windfarm Östra Frölunda was handed in to the County administration board of Västra Götaland. The application treats a permit for twelve turbines with a maximal total height of 200 meters. The area is pointed out in the municipality’s wind plan as a suitable area for windpower.
Read more about Wind fram Östra Frölunda here.

